Tube Seal (Line Oil)
In order to ensure complete internal wall coverage, rotate fuselage or other welded tube assembly to assure all tubes are cycled from upright thru 90° to side, then 90° to inverted, then 90° to opposite side and finally 90° back to upright. A minimum of 5 minutes waiting period should punctuate each 90° arc.
One quart is sufficient to treat a 1 to 4 place aircraft fuselage and miscellaneous tubular components.
Part | Size | Price | |
---|---|---|---|
03-14000 | US Quart | £POA |
![]() |